1. Power the CURB hub by combining both the orange and red wires from the CURB voltage block into the same breaker.

2. Then install as usual, numbering all the circuits. Put stickers A/B stickers on, alternating A and B. The ACTUAL phase does not need to be tested and is arbitrary The stickers are only there to aid in assigning circuits on the "CURB Hub" page.

3. The installer should proceed in naming the "Panel" page circuits, assigning names/breaker #, and phase as the stickers represent. Then enter the HUB's page as advised in the manual.

 